How long does it take to build a website? Realistic NZ timelines

A business website should take three to five weeks. An online store, six to ten. A custom build, two to four months. Most run late, and almost always for the same reason. Here’s what the timeline really looks like and how to keep yours on it.

Rather talk it through?

Call 0800 664 968 or ask for a free preview of your new homepage. Straight answers, no hard sell.

Typical timelines by type

TypeRealistic timelineAssuming
Business website (5–10 pages)3–5 weeksContent and feedback within a few days at each step
Online store (up to ~50 products)6–10 weeksProduct details and photos ready or gathered in parallel
Large content site (30+ pages)8–12 weeksSubject-matter input available; e.g. a clinic’s procedures
Custom build / web app2–4 monthsA discovery phase first, a written scope, no mid-build surprises
DIY builderA weekend to foreverDepends entirely on you

Where the time goes

  1. Brief and preview (week 1). Understanding your business, your customer, your competitors. At MOGGED this ends with a free homepage concept within five working days.
  2. Content (weeks 1–2). Words and photos. This runs in parallel with design and is the stage that most often stalls.
  3. Design (weeks 2–3). Every page, on a live link you can open on a phone. Feedback, revisions, approval.
  4. Build and test (weeks 3–4). Forms, tracking, speed, real devices, accessibility.
  5. Launch (week 4–5). Domain moved, site submitted to Google, training, first-weeks support.

Why projects run late

Almost never the design or the code. Websites run late because:

  • Content isn’t ready. The agency assumed you’d write it; you assumed they would. Weeks pass. Ask up front who writes what. We write it, which removes the biggest delay.
  • Feedback trickles. Five people review it on five different days. Nominate one decision-maker and a 48-hour feedback window.
  • Photos don’t exist. Start shooting on your phone the day you sign. We’ll tell you what to capture.
  • Scope grows. “While you’re in there, could we add…” Yes, and it moves the date. Write the scope down and put extras in phase two.
  • Access is missing. Domain logins, hosting, Google accounts. Gather them in week one.

The 48-hour website

You’ll see NZ offers of a website “live in 48 hours” or “in one week”. Some are honest about what that is: a template with your details dropped in, often with AI-generated copy nobody has read. As a placeholder, fine. As the thing that’s meant to win you work against a competitor with a real site, it isn’t. The average business website is replaced after about two years and four months, and templated sites are why.

The test is simple: ask to see three sites they built, side by side. If they look like the same site with different logos, you’ve found the shortcut.

How AI changes the timeline

Honestly, a lot in the right places. Research, first drafts, testing, code checks and layout options that used to take days now take hours. That’s why we can show a real homepage concept in five working days and launch most business sites within a month, at prices under the NZ agency average.

What it doesn’t compress is judgement: understanding your business, deciding what to say, choosing the design that fits a family law firm rather than a pizza shop, and reading every word before it ships. We keep those slow on purpose. Here’s exactly how we split the work.

Written by Tony at MOGGED

Tony builds websites and runs SEO and ads for New Zealand small businesses from Thorndon Quay, Wellington. Every guide is written from work done for real NZ clients, checked against the sources linked, and updated when the facts change. About MOGGED · Ask Tony a question

Related: Web design · Free homepage preview · Website cost guide

Straight answers

Related questions

Can you build a website in a week?

A one-page site with your content ready, yes. A proper business site, no. And we’d rather tell you that than deliver a template. Your free preview does arrive within five working days, so you’ll see the direction in week one.

What should I have ready before starting?

Your logo, any existing copy or brochures, photos of real work, your domain and hosting logins, and a clear idea of who you want more of. Don’t worry if you’re missing some; we’ll fill gaps as we go.

Does my old site stay up while the new one is built?

Yes. Nothing changes for visitors until launch day, and the switch takes minutes.

What happens after launch?

We stay on call for the first weeks, submit the site to Google, and show you how to update it. Ongoing hosting and support plans are optional.

Next step

Want this done rather than explained?

Start with a free preview of your new homepage and a straight conversation about your business.

Get your free preview